Archive

(749 Total Articles)

Page 6 of 6.

Showing only:Power & Grid(132 entries)Clear filter
Protecting consumer utility rates from data center pressure

The piece is about how data center growth can affect electric bills and utility rates for South Carolina customers. It appears to focus on the power cost side of hosting new load, not on a specific project or site.

Sep 16, 2026
FERC Directs New York Independent System Operator to Revise Tariff to Expedite Data Center Development

FERC is telling New York’s grid operator to change its tariff so data center projects can move through interconnection more quickly. The filing is about power access and the rules that govern it; it does not say which projects will get built, what they will cost hosts, or whether any specific site has been approved.

Grid, interconnection & tariffsOhio & the MidwestPower & Grid
Sep 16, 2026
The 60-Day Clock: FERC Just Forced Six Grid Operators to Rewrite the Rules for Every Data Center Over 20 MW

The piece is about a Federal Energy Regulatory Commission order that would require grid operators to rewrite interconnection and tariff rules for large data center loads. It concerns how new data center demand is handled on the power side, not a specific site, land deal, or water commitment.

Sep 16, 2026
Savannah River Site to host 1-gigawatt data center. Here's what to know

The piece says Savannah River Site is slated to host a proposed 1-gigawatt data center, which puts the story in siting and power. The excerpt does not say what land deal, water plan, tax package, interconnection terms, or local approvals are attached to the project.

Sep 16, 2026
Brookfield to develop gigawatt-scale data center campus at DOE's Kentucky nuclear enrichment plant

Brookfield is said to be planning a large data center campus at the DOE’s Kentucky nuclear enrichment site. The filing or report, as given, does not say how the project will be powered, whether it will use water, what land or tax terms are involved, or what local approvals are still needed.

Sep 16, 2026
PJM Widens Response to Data Center Load as Capacity Shortfalls Deepen

PJM is broadening its response to growing data center load as capacity problems in its region worsen. The piece points to power-system planning and interconnection pressure on large loads, not to a specific project filing or local siting deal.

Sep 16, 2026
Can PA's power grid handle data center development? The PUC worries reliability at risk

Pennsylvania regulators are asking whether the state’s grid can absorb more data center load without hurting reliability. The piece centers on power planning for a proposed buildout, with the public utility commission and PJM in the background, and it does not say that any specific project has won final approval or secured power.

Sep 16, 2026

Showing 126–132 of 132

← PreviousPage 6 of 6Next →